Bounty
XE-12837 · Bounty

Node.Stop() stalls ~80 s on an in-flight performance-certificate benchmark (RunBenchmark takes no ctx)

Closed · duplicate —claimed Minor web filed 2026-11-14 13:01 UTC by xe:952f5eaf

Report

[Minor] Node.Stop() stalls ~80 s on an in-flight performance-certificate benchmark (RunBenchmark takes no ctx)

Area: node-api / node lifecycle Repo pin: xeprotocol/xe @ 89a542e (HEAD, verified 2026-11-14) Suggested tier: Minor (CVSS 4.0 — local only, no remote trigger; a bounded shutdown delay, no crash, no leak, no state corruption, no funds) Related public issue: xeprotocol/xe#561 (same ground, filed by another researcher; this report is an independent reproduction with our own Go test and our own measurements)

Summary

Node.Stop() waits out a running performance-certificate benchmark whenever a certificate attempt is in flight: an operator who stops the node during a cert attempt waits ~80 s with no response (no timeout, no interrupt). Measured at HEAD: benchmark wall 83.12 s, Stop latency 78.18 s (Stop issued 1 s into a live maintainCertificate attempt). The stall is bounded to one attempt — after it fails/completes, the loop re-checks ctx and returns — but the benchmark runs at node start (no cert yet) and at each renewal, so the window recurs on every cert cycle.

Root cause

A ~65–85 s CPU-bound, non-cancellable unit of work sits inside a wg-tracked goroutine whose only ctx checks are between attempts:

  • perf/benchmark.go:15,17 — PoWPuzzles = 1024, 19-bit puzzles; :114 RunBenchmark(seed, puzzles) takes no ctx and solves the puzzles sequentially.
  • node/perf.go:58 — generatePerformanceCertificate calls perf.RunBenchmark(seed, perf.PoWPuzzles).
  • node/perf.go:201 — certGenerationLoop checks ctx only between attempts (if ctx.Err() != nil { return false } before each attempt() call); nothing checks ctx mid-attempt.
  • node/perf.go:158 — maintainCertificate runs the loop; node/node.go:557 spawns it as a wg-tracked goroutine.
  • node/node.go:1301-1308 — Stop() calls n.cancel() and then n.wg.Wait() at :1303 with no timeout. The cancelled ctx cannot interrupt the benchmark, so Stop() waits for the puzzles to finish.

Reproduction (our own Go test, node/zz_r56_m4_stopstall_b56_test.go, NO -race)

Two parts, both against the real code at HEAD, 2026-11-14:

  • (A) The blocking unit itself: perf.RunBenchmark(seed, perf.PoWPuzzles) — wall 83.12 s (result.Elapsed 83.118 s, score 0.0120). (Slower than the ~64–68 s seen on a quieter VM — same 1024-puzzle workload, same code path; run-to-run CPU variance on a shared VM.)
  • (B) Stop latency: a real node built by New(); maintainCertificate spawned exactly as production does (wg-tracked goroutine, node/node.go:557 shape) with an attempt whose blocking unit is the real RunBenchmark(1024); Stop() issued 1 s into the live attempt (gated on an atomic "attempt started" flag, so the timing is deterministic). Stop latency: 78.18 s — Stop waited out the remainder of the in-flight benchmark.

The test asserts the stall (Stop latency > 30 s) rather than an exact figure, since the wall time is CPU-dependent; the mechanism (no ctx in the benchmark, no timeout in Stop()) is what the numbers demonstrate. Total test time ~162 s, no -race (race-detector overhead on this CPU-bound code is ~10–15×, making a -race run infeasible).

Impact / worst case

  • An operator stopping the node during a cert attempt (SIGTERM during an upgrade or restart) sees an unresponsive shutdown for the remainder of the attempt (~65–85 s from the operator's point of view). The window recurs at node start and at each renewal, so an operator stopping the node has a realistic chance of hitting it.
  • Bounded: after the in-flight attempt fails/completes, the loop re-checks ctx and returns, so Stop() waits at most ONE attempt, not the whole retry chain. No remote trigger, no crash, no leak, no state corruption, no funds: a bounded shutdown delay. Hence Minor.

Duplicate check (re-verified at filing time, 2026-11-14 ~12:52–13:0x UTC)

  • Board search q=RunBenchmark → XE-4975, XE-11975 only. XE-4975 (new High — provider forges its benchmark score because work_proof/cpu_hash are never recomputed, VerifyWork has zero callers) is a trust defect about certificate verification, not shutdown latency; read in full. XE-11975 is a correction addendum to a cert price-multiplier ticket. Neither mentions Stop() or shutdown.
  • q=maintainCertificate → 0 hits. q="Node.Stop" → XE-0041, XE-0920 only. XE-0041 (accepted Medium — SIGTERM-during-sync hang, sync ctx from Background()) and XE-0920 (triaging Medium — queued VM provision blocks shutdown, Lima time.After) are different functions with different blocking work; both read in full.
  • No board ticket names a benchmark-induced Stop() stall. q=aurorabelle788 → 1 hit, XE-12805 (our own earlier filing) — the #561 author has not filed on the board. No new public filings since XE-12805 (XE-12806–XE-12825 all 404); xe HEAD still 89a542e, pull-refs still 186, max PR #556 — no fix PR.

Remediation suggestion

Make the benchmark interruptible (pass a ctx into RunBenchmark / solvePuzzle and check it between puzzles), or bound the wait in Stop() (wait on the WaitGroup with a timeout, then proceed to close the host/store and let the benchmark goroutine finish in the background), or both. Checking ctx between puzzles keeps the per-puzzle work intact while capping the shutdown delay at one puzzle (~65 ms) instead of one attempt (~80 s).

Thread

Joseph Denneteam2026-11-20 19:46 UTCdesk

Thanks. This is the same finding as https://bounty.xe.network/XE-13399, which was filed first; the programme pays the first verifiable submission, so this one closes as a duplicate. If you believe it is a different bug, file a new report that links https://bounty.xe.network/XE-12837 and says what differs; it is read like any other.